PRE-OPERATION CHECKS
WARNING
The pre-operation check is very important prior to operating the water-
craft. Always check the proper operation of critical controls, safety fea-
tures and mechanical components, before starting as listed hereinafter. If
not done as specified here, severe injury or death might occur. Bring all
safety equipment required by local laws.
Some of the following items may not have been previously covered in this
guide, however they will be described in the MAINTENANCE or SPECIAL
PROCEDURES section. Please refer to these sections to have more detailed
information.
WARNING
Engine should be off and the safety lanyard should always be removed
from its post prior to verifying any of the following points. Only start wa-
tercraft once all items have been checked and operate properly.
ITEM OPERATION
Hull Inspect.
Jet pump water intake Inspect/clean.
Bilge Drain. Ensure plugs are secured.
Water flow in cooling system (only when
temperature is below or close to freezing
point)
Check if water properly flows out at
jet pump.
Battery
Inspect tightness of cables and
retaining strap(s).
Fuel tank and oil reservoir Refill.
Engine compartment
Check fuel line connections for
tightness. Check for any fuel
leak/odor.
Steering system and side vanes Check operation.
Throttle system
Check operation.
Shifter system Check operation.
Storage compartment covers and seat
Ensure they are closed and latched.
Safety lanyard and engine start/stop button Check operation.
NOTE: See the detailed instructions hereinafter.
48
______________________
www.SeaDooManuals.net
Zobrazit stránku 48
1 2 ... 44 45 46 47 48 49 50 51 52 53 54 ... 120 121

Komentáře k této Příručce

Žádné komentáře